Client: City of Cape Town
Category: Stadiums
Location: Cape Town South Africa
Architect: Stadium Architects (JV)
Completed: 2010
Cape Town Stadium was commissioned for the 2010 FIFA World Cup. The fast-paced mega project was completed on time in 33 months, despite a late change of site and many geometric and communication challenges. Henry Fagan Consulting Engineers & Project Managers were part of a structural design joint venture, and were responsible for most of the stadium’s concrete work (largely precast) which made up the seating slabs, raked beams, post-tensioned first floor amongst other elements.
Winner of South African Steel Construction Awards 2009